Power plant · North Ayrshire, Scotland, United Kingdom
Nethermains - Solar Farm
Nethermains - Solar Farm is a solar power plant under construction in North Ayrshire, Scotland, United Kingdom, with 7.5 MW of capacity, operated by North Ayrshire Council.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Ayrshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Nethermains Landfill, KA12 8EE | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 10 May 2023 (reference 23/00317/PP, planning authority North Ayrshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | North Ayrshire Council | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 7.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 24.3 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.6146, -4.6718 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Construction started
- Permit applied for (planning authority North Ayrshire, reference 23/00317/PP)
How it compares
Nethermains - Solar Farm is the 634th-largest of 742 power plants planned, permitted or under construction in Scotland and the 1,972nd-largest of 2,548 in the United Kingdom by capacity; its 7.5 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 634th of 742 | 93,216 MW | <0.1% |
| United Kingdom | 1,972nd of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,098th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 16 substations, 6 grid connections (2 operating, 4.05 MW) and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ballochmartin Farm grid connection | Grid connection | 3.5 MW | Planned | 23 km |
| Bruchag Primary | Substation | — | — | 27 km |
| Brodick Primary | Substation | — | — | 30 km |
| Whiting Bay Primary | Substation | — | — | 30 km |
| Glenkiln Farm grid connection | Grid connection | 4 MW | Planned | 31 km |
| iomart Glasgow Data Centre | Data center | — | — | 36 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 37 km |
| DataVita DV2 | Data center | — | — | 37 km |
| Auchencarroch Energy Ltd grid connection | Grid connection | 3.04 MW | Operating | 43 km |
Operator and place
More from North Ayrshire Council
- Shewalton Landfill Solar Farm5 MW · under construction
- Nethermains5 MW
- Shewalton Landfill Site3 MW
- Nethermains PV grid connection6.69 MW
- Shewalton Farm grid connection4.93 MW
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.