Nether Carswell Cottage Wind Turbine is a permitted wind power plant in East Ayrshire, Scotland, United Kingdom, with 4.2 MW of capacity, operated by Nether Carswell Three Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Ayrshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address370m S/O Nether Carswell Cottage Kingston Road, Neilston Kilmarnock, KA3 4EQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (appeal granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 May 2025 (permit 2020/0578/TP, Town and Country Planning Act, issued by East Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Sept 2020 (reference 2020/0578/TP, planning authority East Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Apr 2024 (refused, reference 2020/0578/TP, planning authority East Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 May 2025 (appeal granted, reference 2020/0578/TP, planning authority East Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 May 2025 (granted, reference 2020/0578/TP, planning authority East Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNether Carswell Three Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units1 units (4.2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.7418, -4.4692DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority East Ayrshire, reference 2020/0578/TP)
  2. Permit granted (appeal granted, planning authority East Ayrshire, reference 2020/0578/TP)
  3. Permit refused (planning authority East Ayrshire, reference 2020/0578/TP)
  4. Permit applied for (planning authority East Ayrshire, reference 2020/0578/TP)

How it compares

Nether Carswell Cottage Wind Turbine is the 668th-largest of 742 power plants planned, permitted or under construction in Scotland and the 2,123rd-largest of 2,548 in the United Kingdom by capacity; its 4.2 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland668th of 74293,216 MW<0.1%
United Kingdom2,123rd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,285th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 17 substations, 13 grid connections (7 operating, 61.9 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
iomart Glasgow Data CentreData center——17 km
Verizon Glasgow GLSGGBData center——18 km
DataVita DV2Data center——18 km
Strathleven GSPSubstation——25 km
Ballochmartin Farm grid connectionGrid connection3.5 MWPlanned28 km
Auchencarroch Energy Ltd grid connectionGrid connection3.04 MWOperating29 km
Auchincarroch (GEN464G2) grid connectionGrid connection1.01 MWOperating29 km
Blairlinnans PrimarySubstation——33 km
Dumfin 11kV NetworkSubstation——34 km

Operator and place

More from Nether Carswell Three Limited

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page