Power plant · Fife, Scotland, United Kingdom

Lingo Wind Farm

Lingo Wind Farm is a cancelled power plant in Fife, Scotland, United Kingdom, with 12.5 MW of capacity, operated by Lingo Wind Energy Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFife (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLingo Farm, Lingo, FifeDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jan 2012 (reference 12/00129/EIA, planning authority Fife)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date31 Jan 2013 (refused, reference 12/00129/EIA, planning authority Fife)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Oct 2013 (appeal refused, reference 12/00129/EIA, planning authority Fife)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLingo Wind Energy Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units5 units (2.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.2736, -2.7868DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Fife, reference 12/00129/EIA)
  2. Permit refused (planning authority Fife, reference 12/00129/EIA)
  3. Permit applied for (planning authority Fife, reference 12/00129/EIA)

How it compares

Lingo Wind Farm is the 647th-largest of 1,326 power plants in Scotland and the 1,954th-largest of 5,723 in the United Kingdom by capacity; its 12.5 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland647th of 1,32640,645 MW<0.1%
United Kingdom1,954th of 5,723136,106 MW<0.1%
All power plants in our data6,371st of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 84 grid connections (25 operating, 383 MW), 56 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Broughty Ferry PrimarySubstation——22 km
Edzell Street PrimarySubstation——23 km
Baldovie PrimarySubstation——24 km
Baldovie Road grid connectionGrid connection4.21 MWOperating24 km
Locarno Works grid connectionGrid connection43.6 MWPlanned24 km
Poundstretchers Ltd grid connectionGrid connection53.2 MWPlanned24 km
RBS Data CentreData center——37 km
RBS Melville Gate Data CentreData center——46 km
Data center, Scotland (OSM way 1548060501)Data center——48 km

Operator and place

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page