Power plant · Scotland, United Kingdom

Inner Sound Phase 1A (MeyGen)

Inner Sound Phase 1A (MeyGen) is a power plant in Scotland, United Kingdom, with 6 MW of capacity, operated by Atlantis Resources.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPentland Firth and Orkney waters strategic area, between Caithness on the Scottish mainland and the island of Stroma, KW1 4YLDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Sept 2013 (Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Jul 2012 (planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Sept 2013 (granted, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAtlantis ResourcesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyTidal StreamDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.7439, -3.1129DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Scottish Government (S36))
  3. Permit applied for (planning authority Scottish Government (S36))

How it compares

Inner Sound Phase 1A (MeyGen) is the 816th-largest of 1,326 power plants in Scotland and the 2,973rd-largest of 5,723 in the United Kingdom by capacity; its 6 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland816th of 1,32640,645 MW<0.1%
United Kingdom2,973rd of 5,723136,106 MW<0.1%
All power plants in our data8,531st of 12,7051,210,931 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 60 grid connections (30 operating, 303 MW) and 20 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Flotta Terminal grid connectionGrid connection9.5 MWOperating9.1 km
Windfarm Import/Export grid connectionGrid connection2.07 MWOperating9.1 km
Flotta PrimarySubstation——10.0 km
HOY Wind Farm grid connectionGrid connection66 MWPlanned11 km
Lyness PrimarySubstation——11 km
St Mary's PrimarySubstation——20 km

Operator and place

More from Atlantis Resources

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page