Power plant · North Ayrshire, Scotland, United Kingdom
Hunterston Test Centre (Phase 2)
Hunterston Test Centre (Phase 2) is a cancelled power plant in North Ayrshire, Scotland, United Kingdom, with 8 MW of capacity, operated by SSE plc and Scottish Enterprise.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Ayrshire (planning authority), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Hunterston Construction Yard, Fairlie Largs, Largs, KA30 9AG | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning application withdrawn) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Jan 2016 (reference 16/00060/PP, planning authority North Ayrshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 4 Aug 2016 (withdrawn, reference 16/00060/PP, planning authority North Ayrshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | SSE plc (Scottish Enterprise/SSE) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Scottish Enterprise (Scottish Enterprise/SSE) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 8 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 1 units (8 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.7354, -4.8818 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Hunterston Test Centre (Phase 2) is the 663rd-largest of 1,196 power plants in Scotland and the 2,176th-largest of 5,050 in the United Kingdom by capacity; its 8 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 663rd of 1,196 | 34,589 MW | <0.1% |
| United Kingdom | 2,176th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 7,598th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 34 substations, 23 grid connections (12 operating, 104 MW) and 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ballochmartin Farm grid connection | Grid connection | 3.5 MW | Planned | 4.5 km |
| Bruchag Primary | Substation | — | — | 8.9 km |
| Rothesay Primary | Substation | — | — | 16 km |
| Innellan Primary | Substation | — | — | 18 km |
| 45MW Battery grid connection | Grid connection | 52.7 MW | Planned | 27 km |
| Glenkiln Farm grid connection | Grid connection | 4 MW | Planned | 28 km |
| iomart Glasgow Data Centre | Data center | — | — | 40 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 41 km |
| DataVita DV2 | Data center | — | — | 41 km |
Operators and place
More from SSE plc
- Dogger Bank A & B (was Creyke Beck A & B)2,400 MW · under construction
- Dogger Bank C (was Teesside A)1,200 MW · under construction
- Seagreen1,075 MW
- Seagreen Phase 1A540 MW · permitted
- Hunterston Test Centre13 MW
- Hunterston5 MW
- Salisbury Battery Storage Project grid connection49.5 MW
- SSE data center, Havantdata center
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.