Hillhouse Quarry, Railway Bridge - Solar Array
Hillhouse Quarry, Railway Bridge - Solar Array is a planned power plant in South Ayrshire, Scotland, United Kingdom, with 3 MW of capacity, operated by Hillhouse Quarry Company Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | South Ayrshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Hillhouse Quarry, B730 From A759 Jnct Dundonald To Council Boundary, S/O Railway Bridge, Dundonald, Kilmarnock, Strathclyde, KA2 9BE | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 5 Jun 2024 (reference 24/00424/APP, planning authority South Ayrshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Hillhouse Quarry Company Limited (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 3 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 3.81 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.5896, -4.6040 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority South Ayrshire, reference 24/00424/APP)
How it compares
Hillhouse Quarry, Railway Bridge - Solar Array is the 688th-largest of 742 power plants planned, permitted or under construction in Scotland and the 2,185th-largest of 2,549 in the United Kingdom by capacity; its 3 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 688th of 742 | 93,216 MW | <0.1% |
| United Kingdom | 2,185th of 2,549 | 279,978 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,351st of 5,782 | 643,557 MW | <0.1% |
Nearby
Within 50 km of this power plant: 13 substations, 5 grid connections (2 operating, 4.05 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Ballochmartin Farm grid connection | Grid connection | 3.5 MW | Planned | 28 km |
| Bruchag Primary | Substation | — | — | 32 km |
| Whiting Bay Primary | Substation | — | — | 33 km |
| Brodick Primary | Substation | — | — | 34 km |
| Glenkiln Farm grid connection | Grid connection | 4 MW | Planned | 35 km |
| iomart Glasgow Data Centre | Data center | — | — | 35 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 37 km |
| DataVita DV2 | Data center | — | — | 37 km |
| Auchencarroch Energy Ltd grid connection | Grid connection | 3.04 MW | Operating | 45 km |
Operator and place
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Braston New Energy500 MW
- Gretna Green Battery Storage456 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.