Power plant · Aberdeenshire, Scotland, United Kingdom

Hill of Stoneyfield - Wind Turbines

Hill of Stoneyfield - Wind Turbines is a planned power plant in Aberdeenshire, Scotland, United Kingdom, with 14.4 MW of capacity, operated by Wind 2 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe E/O Chapelton Farm, Drumblade, Huntly, AB54 6ASDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 May 2025 (reference APP/2025/0514, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWind 2 LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity14.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units3 units (4.8 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.4059, -2.6567DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Aberdeenshire, reference APP/2025/0514)

How it compares

Hill of Stoneyfield - Wind Turbines is the 656th-largest of 872 power plants planned, permitted or under construction in Scotland and the 2,146th-largest of 3,222 in the United Kingdom by capacity; its 14.4 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland656th of 87299,272 MW<0.1%
United Kingdom2,146th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data4,509th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 137 grid connections (60 operating, 500 MW), 89 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Gartly Moor grid connectionGrid connection20 MWPlanned3.6 km
Dummuie Windfarm grid connectionGrid connection11.6 MWOperating5.1 km
Kirkton Farm Wind Turbine Project grid connectionGrid connection6.56 MWOperating5.5 km
Insch PrimarySubstation——7.0 km
Rothienorman GSPSubstation——8.4 km
Huntly PrimarySubstation——8.8 km
BrightsolidData center——41 km

Operator and place

More from Wind 2 Limited

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page