Power plant · Aberdeenshire, Scotland, United Kingdom

Hill of Snowy Slack

Hill of Snowy Slack is a cancelled power plant in Aberdeenshire, Scotland, United Kingdom, with 22 MW of capacity, operated by Npower Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAt Kil Drummuie Mr LumbersdoneDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning application withdrawn)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Jan 2005 (reference M/APP/2004/4603, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date9 May 2006 (withdrawn, reference M/APP/2004/4603, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNpower RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity22 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units11 units (2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.2582, -2.9040DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Withdrawn (planning authority Aberdeenshire, reference M/APP/2004/4603)
  2. Permit applied for (planning authority Aberdeenshire, reference M/APP/2004/4603)

How it compares

Hill of Snowy Slack is the 394th-largest of 1,196 power plants in Scotland and the 997th-largest of 5,050 in the United Kingdom by capacity; its 22 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland394th of 1,19634,589 MW<0.1%
United Kingdom997th of 5,050115,622 MW<0.1%
All power plants in our data3,625th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 110 grid connections (52 operating, 594 MW), 70 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Kildrummy Windfarm grid connectionGrid connection17.5 MWOperating0.6 km
Mossat PrimarySubstation——2.1 km
Wheedlemont Wind grid connectionGrid connection1.62 MWOperating8.0 km
Cairnmore Wind Park grid connectionGrid connection7.27 MWOperating8.4 km
Strathdon PrimarySubstation——11 km
Tarland GSPSubstation——14 km
BrightsolidData center——46 km

Operator and place

More from Npower Renewables

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page