Power plant · Fife, Scotland, United Kingdom

Glenniston Farm, Auchtertool - Solar Farm

Glenniston Farm, Auchtertool - Solar Farm is a permitted battery storage plant in Fife, Scotland, United Kingdom, with 10 MW of capacity, operated by Locogen Consulting Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFife (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGlenniston Farm Gleniston Auchtertool Lochgelly, KY5 0AXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Apr 2024 (permit 23/02598/FULL, Town and Country Planning Act, issued by Fife)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Sept 2023 (reference 23/02598/FULL, planning authority Fife)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Apr 2024 (granted, reference 23/02598/FULL, planning authority Fife)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLocogen Consulting Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.1163, -3.2621DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Fife, reference 23/02598/FULL)
  2. Permit applied for (planning authority Fife, reference 23/02598/FULL)

How it compares

Glenniston Farm, Auchtertool - Solar Farm is the 601st-largest of 742 power plants planned, permitted or under construction in Scotland and the 1,857th-largest of 2,548 in the United Kingdom by capacity; its 10 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland601st of 74293,216 MW<0.1%
United Kingdom1,857th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data4,945th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 62 grid connections (19 operating, 355 MW), 48 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Milnathort PrimarySubstation——16 km
Binn Farm Glenfarg grid connectionGrid connection30 MWPlanned19 km
Pulsant Edinburgh SC-1Data center——21 km
Pulsant Edinburgh South Gyle SC-1Data center——21 km
Lloyds Banking Group data center, ScotlandData center——21 km
Shire End 20MW PV grid connectionGrid connection20 MWPlanned21 km
Fragland grid connectionGrid connection120 MWPlanned21 km
Glendevon PrimarySubstation——24 km
Abernethy GSPSubstation——25 km

Operator and place

More from Locogen Consulting Limited

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page