Power plant · Angus, Scotland, United Kingdom

Glaxo Smith Kline Wind Turbine

Glaxo Smith Kline Wind Turbine is a cancelled power plant in Angus, Scotland, United Kingdom, with 5 MW of capacity, operated by WSP Environmental.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAngus (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSite 2 & 3 Cobden Street MontroseDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Dec 2011 (reference 11/01184/EIAL, planning authority Angus)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date29 Aug 2012 (refused, reference 11/01184/EIAL, planning authority Angus)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWSP EnvironmentalDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units2 units (2.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.7074, -2.4520DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Angus, reference 11/01184/EIAL)
  2. Permit applied for (planning authority Angus, reference 11/01184/EIAL)

How it compares

Glaxo Smith Kline Wind Turbine is the 755th-largest of 1,196 power plants in Scotland and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland755th of 1,19634,589 MW<0.1%
United Kingdom2,742nd of 5,050115,622 MW<0.1%
All power plants in our data8,380th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 82 grid connections (24 operating, 298 MW) and 61 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Mill Road PrimarySubstation——1.1 km
Montrose North PrimarySubstation——2.1 km
Craigo and Glenskinno Farm Solar grid connectionGrid connection75 MWPlanned6.5 km
Balwyllo Farm grid connectionGrid connection49.9 MWPlanned6.5 km
Dunmill Energy Storage Scheme grid connectionGrid connection76.2 MWPlanned6.5 km
Bridge of Dun GSPSubstation——6.6 km