Power plant · East Renfrewshire, Scotland, United Kingdom
Glasgow Road, Eaglesham - Battery Storage Facility
Glasgow Road, Eaglesham - Battery Storage Facility is a permitted power plant in East Renfrewshire, Scotland, United Kingdom, with 40 MW of capacity, operated by GPC 1137 Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Renfrewshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | E/O Glasgow Road, Eaglesham, G76 0DN | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 15 Apr 2025 (permit 2025/0043/TP, Town and Country Planning Act, issued by East Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 24 Jan 2025 (reference 2025/0043/TP, planning authority East Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 15 Apr 2025 (granted, reference 2025/0043/TP, planning authority East Renfrewshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | GPC 1137 Limited (GPC 1137 Limited (Apatura), applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 40 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.7522, -4.2766 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority East Renfrewshire, reference 2025/0043/TP)
- Permit applied for (planning authority East Renfrewshire, reference 2025/0043/TP)
How it compares
Glasgow Road, Eaglesham - Battery Storage Facility is the 400th-largest of 742 power plants planned, permitted or under construction in Scotland and the 1,136th-largest of 2,549 in the United Kingdom by capacity; its 40 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 400th of 742 | 93,216 MW | <0.1% |
| United Kingdom | 1,136th of 2,549 | 279,978 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,350th of 5,782 | 643,557 MW | <0.1% |
Nearby
Within 50 km of this power plant: 13 substations, 9 grid connections (4 operating, 26.9 MW) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| iomart Glasgow Data Centre | Data center | — | — | 11 km |
| Asanti Hamilton | Data center | — | — | 11 km |
| Verizon Glasgow GLSGGB | Data center | — | — | 12 km |
| Strathleven GSP | Substation | — | — | 29 km |
| Auchencarroch Energy Ltd grid connection | Grid connection | 3.04 MW | Operating | 32 km |
| Auchincarroch (GEN464G2) grid connection | Grid connection | 1.01 MW | Operating | 32 km |
| Killearn Primary | Substation | — | — | 34 km |
| Generating Station grid connection | Grid connection | 21.4 MW | Operating | 34 km |
| Drymen Primary | Substation | — | — | 36 km |
Operator and place
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Braston New Energy500 MW
- Gretna Green Battery Storage456 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.