Power plant · Fife, Scotland, United Kingdom

Easter Muirhead Farm

Easter Muirhead Farm is a cancelled power plant in Fife, Scotland, United Kingdom, with 15 MW of capacity, operated by ABO Wind UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationFife (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth of Saline, Dunfermline, Fife, KY12 9UGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date12 Jun 2009 (reference 09/01359/WEIA, planning authority Fife)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Oct 2018 (refused, reference 09/01359/WEIA, planning authority Fife)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorABO Wind UK (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units5 units (3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.1296, -3.6291DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Fife, reference 09/01359/WEIA)
  2. Permit applied for (planning authority Fife, reference 09/01359/WEIA)

How it compares

Easter Muirhead Farm is the 591st-largest of 1,326 power plants in Scotland and the 1,736th-largest of 5,723 in the United Kingdom by capacity; its 15 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland591st of 1,32640,645 MW<0.1%
United Kingdom1,736th of 5,723136,106 MW<0.1%
All power plants in our data5,466th of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 48 grid connections (17 operating, 217 MW), 30 substations and 13 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Glendevon PrimarySubstation——8.7 km
Milnathort PrimarySubstation——17 km
Windburn Wind Farm 75MW Wind, 35MW BESS grid connectionGrid connection110 MWPlanned17 km
Highland Spring Group grid connectionGrid connection5.5 MWPlanned17 km
Shire End 20MW PV grid connectionGrid connection20 MWPlanned19 km
Gleneagles PrimarySubstation——19 km
Edinburgh SC-3Data center——26 km
Sungard Availability ServicesData center——30 km
Pulsant Edinburgh SC-1Data center——30 km

Operator and place

More from ABO Wind UK

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page