Power plant · Na h-Eileanan Siar, Scotland, United Kingdom

Druim Leathann Windfarm

Druim Leathann Windfarm is a permitted power plant in Na h-Eileanan Siar, Scotland, United Kingdom, with 48.3 MW of capacity, operated by Baywa R.E. UK Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNa h-Eileanan Siar (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressDruim Leathann Windfarm, North Tolsta, Isle Of Lewis, HS2 0NDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Jun 2022 (permit 18/00216/PPDM, Town and Country Planning Act, issued by Na h-Eileanan Siar)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Jun 2018 (reference 18/00216/PPDM, planning authority Na h-Eileanan Siar)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Jun 2022 (granted, reference 18/00216/PPDM, planning authority Na h-Eileanan Siar)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBaywa R.E. UK LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity48.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units14 units (3.45 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.3125, -6.2685DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Druim Leathann Windfarm is the 411th-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,256th-largest of 3,222 in the United Kingdom by capacity; its 48.3 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland411th of 87299,272 MW<0.1%
United Kingdom1,256th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,358th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 21 grid connections (14 operating, 56.4 MW) and 8 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Wind 49.7 MW grid connection at Stornoway GridGrid connection49.7 MWPlanned3.9 km
Coll PrimarySubstation——4.5 km
Battery - 25MW grid connectionGrid connection25 MWPlanned13 km
Wind 38.92 MW grid connection at Stornoway GridGrid connection38.9 MWPlanned13 km
Battery Point PrimarySubstation——14 km
Stornoway GSPSubstation——15 km

Operator and place

More from Baywa R.E. UK Limited

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom