Power plant · Moray, Scotland, United Kingdom

Dorenell Extension Wind Farm

Dorenell Extension Wind Farm is a planned power plant in Moray, Scotland, United Kingdom, with 477 MW of capacity, operated by Galileo.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMoray (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address10 km south of Dufftown, AB37 9JRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Aug 2025 (reference ECU00004862, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGalileo (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity477 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units67 units (7.2 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.3238, -3.2496DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Scottish Government (S36), reference ECU00004862)

How it compares

Dorenell Extension Wind Farm is the 43rd-largest of 742 power plants planned, permitted or under construction in Scotland and the 146th-largest of 2,549 in the United Kingdom by capacity; its 477 MW is 0.17% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland43rd of 74293,216 MW0.51%
United Kingdom146th of 2,549279,978 MW0.17%
All power plants planned, permitted or under construction in our data310th of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 70 grid connections (28 operating, 467 MW) and 45 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Ballindalloch PrimarySubstation——9.8 km
Glenfarclas GSPSubstation——11 km
Pauls Hill Wind Farm grid connectionGrid connection66.5 MWOperating12 km
Aberlour PrimarySubstation——14 km
Advanced Fuel Gasification OR Pyrolysis 9.899 MW grid connection at Keith GridGrid connection9.9 MWOperating18 km
Clashindarroch Wind Farm 2 - Addcap grid connectionGrid connection77 MWPlanned20 km