Power plant · East Lothian, Scotland, United Kingdom
Crystal Rig Wind Farm Phase III
Crystal Rig Wind Farm Phase III is a power plant in East Lothian, Scotland, United Kingdom, with 13.8 MW of capacity, operated by Fred Olsen Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Lothian (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Crystal Rigg Wind Farm, Cranshaws Duns, Scottish Borders, TD11 3SR | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 18 Jun 2015 (Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 14 Jun 2013 (planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 18 Jun 2015 (granted, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Fred Olsen Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 13.8 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 6 units (2.3 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.9278, -2.5315 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Commissioned
- Permit granted (planning authority Scottish Government (S36))
- Permit applied for (planning authority Scottish Government (S36))
How it compares
Crystal Rig Wind Farm Phase III is the 554th-largest of 1,196 power plants in Scotland and the 1,524th-largest of 5,050 in the United Kingdom by capacity; its 13.8 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 554th of 1,196 | 34,589 MW | <0.1% |
| United Kingdom | 1,524th of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 5,581st of 12,032 | 1,190,447 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
Nearby
Within 50 km of this power plant: 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| RBS Data Centre | Data center | — | — | 23 km |
| RBS Melville Gate Data Centre | Data center | — | — | 35 km |
| Data center, Scotland (OSM way 1548060501) | Data center | — | — | 45 km |
Operator and place
More from Fred Olsen Renewables
- Crystal Rig Wind Farm Phase 2a138 MW
- Rothes Wind Farm III132 MW · permitted
- Lethen Wind Farm Wind Turbines and Energy Storage102 MW
- Brochloch Rig (formerly Windy Standard II)90 MW
- Windy Standard III Wind Farm (Brockloch Rig Phase 2)87.6 MW · under construction
- Crystal Rig Phase 1 Repowering72 MW · planned
- Paul's Hill and Extension65 MW
- Crystal Rig Phase 162.5 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.