Chariot Drive, Newbridge Road - Solar Panels is a permitted power plant in City of Edinburgh, Scotland, United Kingdom, with 1.22 MW of capacity, operated by Nuveen Real Estate.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCity of Edinburgh (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address1 & 2 Chariot Drive, 2 Newbridge Road & 1 & 2 Huly Hill Road Newbridge, EH28 8PHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date9 Nov 2022 (permit 22/03835/FUL, Town and Country Planning Act, issued by City of Edinburgh)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Sept 2022 (reference 22/03835/FUL, planning authority City of Edinburgh)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date9 Nov 2022 (granted, reference 22/03835/FUL, planning authority City of Edinburgh)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNuveen Real EstateDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.22 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.9387, -3.4014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority City of Edinburgh, reference 22/03835/FUL)
  2. Permit applied for (planning authority City of Edinburgh, reference 22/03835/FUL)

How it compares

Chariot Drive, Newbridge Road - Solar Panels is the 843rd-largest of 872 power plants planned, permitted or under construction in Scotland and the 3,019th-largest of 3,222 in the United Kingdom by capacity; its 1.22 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland843rd of 87299,272 MW<0.1%
United Kingdom3,019th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,248th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 30 grid connections (10 operating, 122 MW), 11 data centers and 10 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Edinburgh SC-3Data center——1.2 km
Edinburgh SC-2Data center——6.7 km
Pulsant Edinburgh SC-1Data center——6.8 km
Milnathort PrimarySubstation——32 km
Glendevon PrimarySubstation——33 km
Shire End 20MW PV grid connectionGrid connection20 MWPlanned37 km
Binn Farm Glenfarg grid connectionGrid connection30 MWPlanned39 km
Lochebank Windfarm grid connectionGrid connection9.45 MWOperating40 km
Gleneagles PrimarySubstation——44 km