Brims Tidal Array (Cantick Head)

Brims Tidal Array (Cantick Head) is a planned power plant in Scotland, United Kingdom, with 200 MW of capacity, operated by DCNS OpenHydro and SSE Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressPentland Firth, Off South Walls, Hoy, Orkney Islands, KW17DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date20 May 2016 (planning authority Marine Scotland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDCNS OpenHydro (DCNS OpenHydro/SSE Renewables, applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSSE Renewables (DCNS OpenHydro/SSE Renewables, applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity200 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyTidal StreamDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.7638, -3.2313DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Marine Scotland)

How it compares

Brims Tidal Array (Cantick Head) is the 76th-largest of 742 power plants planned, permitted or under construction in Scotland and the 270th-largest of 2,549 in the United Kingdom by capacity; its 200 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland76th of 74293,216 MW0.21%
United Kingdom270th of 2,549279,978 MW<0.1%
All power plants planned, permitted or under construction in our data732nd of 5,782643,557 MW<0.1%

Nearby

Within 50 km of this power plant: 61 grid connections (30 operating, 303 MW) and 21 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
HOY Wind Farm grid connectionGrid connection66 MWPlanned7.7 km
Lyness PrimarySubstation——7.9 km
Orkney Community Wind Farm - HOY grid connectionGrid connection30 MWPlanned8.7 km
Flotta PrimarySubstation——9.8 km
Flotta Terminal grid connectionGrid connection9.5 MWOperating10 km
Rackwick PrimarySubstation——16 km

Operators and place

Other power plants in Scotland

All 2107 power plants in Scotland, United Kingdom

Data on this page