Power plant · South Ayrshire, Scotland, United Kingdom

Braston New Energy Battery Storage

Braston New Energy Battery Storage is a cancelled battery storage plant in South Ayrshire, Scotland, United Kingdom, with 500 MW of capacity, operated by New Energy Partnership.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Ayrshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressA77, Masonhill, Alloway, KA7 3PFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date23 Apr 2025 (permit ECU00004995, Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 Apr 2024 (reference ECU00004995, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Apr 2025 (granted, reference ECU00004995, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNew Energy Partnership (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity500 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.4444, -4.5921DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Scottish Government (S36), reference ECU00004995)
  2. Permit applied for (planning authority Scottish Government (S36), reference ECU00004995)

How it compares

Braston New Energy is the 11th-largest of 1,340 power plants in Scotland and the 77th-largest of 5,834 in the United Kingdom by capacity; its 500 MW is 0.25% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland11th of 1,34046,467 MW1.1%
United Kingdom77th of 5,834200,500 MW0.25%
All power plants in our data1,193rd of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 4 substations, 2 grid connections and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Whiting Bay PrimarySubstation——33 km
Glenkiln Farm grid connectionGrid connection4 MWPlanned36 km
Brodick PrimarySubstation——37 km
Ballochmartin Farm grid connectionGrid connection3.5 MWPlanned42 km
Bruchag PrimarySubstation——45 km
Asanti HamiltonData center——48 km
iomart Glasgow Data CentreData center——49 km

Operator and place

More from New Energy Partnership

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page