Binn Farm AD (extension)

Binn Farm AD (extension) is a biomass power plant in Perth and Kinross, Scotland, United Kingdom, with 1.5 MW of capacity, operated by Earnside Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPerth and Kinross (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTeg Environmental, Binn Farm, Perth, Tayside, PH2 9PXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2018DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date27 Jan 2016 (permit 15/02102/FLL, Town and Country Planning Act, issued by Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Dec 2015 (reference 15/02102/FLL, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Jan 2016 (granted, reference 15/02102/FLL, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEarnside EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyAnaerobic DigestionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.3102, -3.3332DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Perth and Kinross, reference 15/02102/FLL)
  3. Permit applied for (planning authority Perth and Kinross, reference 15/02102/FLL)

How it compares

Binn Farm AD (extension) is the 1,225th-largest of 1,340 power plants in Scotland and the 5,225th-largest of 5,834 in the United Kingdom by capacity; its 1.5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland1,225th of 1,34046,467 MW<0.1%
United Kingdom5,225th of 5,834200,500 MW<0.1%
All power plants in our data14,762nd of 15,8001,923,633 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 88 grid connections (28 operating, 407 MW), 61 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Binn Ecopar grid connectionGrid connection9.9 MWPlanned0.6 km
Binn Farm - Wind grid connectionGrid connection9.9 MWPlanned0.6 km
Binn Farm Wind Farm grid connectionGrid connection6.7 MWOperating0.7 km
Abernethy PrimarySubstation——4.1 km
Abernethy GSPSubstation——4.1 km
Bridge of Earn PrimarySubstation——5.8 km
Pulsant Edinburgh SC-1Data center——42 km
Pulsant Edinburgh South Gyle SC-1Data center——42 km
Lloyds Banking Group data center, ScotlandData center——43 km

Operator and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page