Power plant · Perth and Kinross, Scotland, United Kingdom

Binn Eco Park - EfW

Binn Eco Park - EfW is a power plant under construction in Perth and Kinross, Scotland, United Kingdom, with 7.3 MW of capacity, operated by Binn Group.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPerth and Kinross (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBinn Farm, Glenfarg, Perth, Tayside, PH2 9PXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Dec 2020 (permit 20/01242/FLM, Town and Country Planning Act, issued by Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Sept 2020 (reference 20/01242/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Dec 2020 (granted, reference 20/01242/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBinn GroupDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity7.3 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.3036, -3.3415DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Perth and Kinross, reference 20/01242/FLM)
  3. Permit applied for (planning authority Perth and Kinross, reference 20/01242/FLM)

How it compares

Binn Eco Park - EfW is the 721st-largest of 872 power plants planned, permitted or under construction in Scotland and the 2,396th-largest of 3,222 in the United Kingdom by capacity; its 7.3 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland721st of 87299,272 MW<0.1%
United Kingdom2,396th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,506th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 89 grid connections (29 operating, 427 MW), 61 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Binn Farm Wind Farm grid connectionGrid connection6.7 MWOperating0.2 km
Binn Farm - Wind grid connectionGrid connection9.9 MWPlanned0.3 km
Binn Ecopar grid connectionGrid connection9.9 MWPlanned0.3 km
Abernethy PrimarySubstation——5.0 km
Abernethy GSPSubstation——5.0 km
Bridge of Earn PrimarySubstation——5.9 km
Pulsant Edinburgh SC-1Data center——42 km
Pulsant Edinburgh South Gyle SC-1Data center——42 km
Edinburgh SC-3Data center——42 km

Operator and place

More from Binn Group

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page