Power plant · Perth and Kinross, Scotland, United Kingdom
Binn Eco Park - EfW
Binn Eco Park - EfW is a power plant under construction in Perth and Kinross, Scotland, United Kingdom, with 7.3 MW of capacity, operated by Binn Group.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Perth and Kinross (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Binn Farm, Glenfarg, Perth, Tayside, PH2 9PX | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 17 Dec 2020 (permit 20/01242/FLM, Town and Country Planning Act, issued by Perth and Kinross) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 4 Sept 2020 (reference 20/01242/FLM, planning authority Perth and Kinross) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 17 Dec 2020 (granted, reference 20/01242/FLM, planning authority Perth and Kinross) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Binn Group | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 7.3 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | EfW Incineration | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 56.3036, -3.3415 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Construction started
- Permit granted (planning authority Perth and Kinross, reference 20/01242/FLM)
- Permit applied for (planning authority Perth and Kinross, reference 20/01242/FLM)
How it compares
Binn Eco Park - EfW is the 721st-largest of 872 power plants planned, permitted or under construction in Scotland and the 2,396th-largest of 3,222 in the United Kingdom by capacity; its 7.3 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 721st of 872 | 99,272 MW | <0.1% |
| United Kingdom | 2,396th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,506th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 89 grid connections (29 operating, 427 MW), 61 substations and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Binn Farm Wind Farm grid connection | Grid connection | 6.7 MW | Operating | 0.2 km |
| Binn Farm - Wind grid connection | Grid connection | 9.9 MW | Planned | 0.3 km |
| Binn Ecopar grid connection | Grid connection | 9.9 MW | Planned | 0.3 km |
| Abernethy Primary | Substation | — | — | 5.0 km |
| Abernethy GSP | Substation | — | — | 5.0 km |
| Bridge of Earn Primary | Substation | — | — | 5.9 km |
| Pulsant Edinburgh SC-1 | Data center | — | — | 42 km |
| Pulsant Edinburgh South Gyle SC-1 | Data center | — | — | 42 km |
| Edinburgh SC-3 | Data center | — | — | 42 km |
Operator and place
More from Binn Group
- Binn Eco Park4.6 MW · permitted
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.