Power plant · Scottish Borders, Scotland, United Kingdom

Barrel Law Wind Farm

Barrel Law Wind Farm is a cancelled wind power plant in Scottish Borders, Scotland, United Kingdom, with 24.5 MW of capacity, operated by Barrel Law Windfarm.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScottish Borders (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand South West Of, Whitslade, Ashkirk, Selkirk, Borders, TD7 4PHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Sept 2017 (reference 17/01255/FUL, planning authority Scottish Borders)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date3 Sept 2018 (refused, reference 17/01255/FUL, planning authority Scottish Borders)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Dec 2019 (appeal refused, reference 17/01255/FUL, planning authority Scottish Borders)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBarrel Law Windfarm (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity24.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units7 units (3.5 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.4518, -2.9283DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Scottish Borders, reference 17/01255/FUL)
  2. Permit refused (planning authority Scottish Borders, reference 17/01255/FUL)
  3. Permit applied for (planning authority Scottish Borders, reference 17/01255/FUL)

How it compares

Barrel Law Wind Farm is the 439th-largest of 1,340 power plants in Scotland and the 1,314th-largest of 5,834 in the United Kingdom by capacity; its 24.5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland439th of 1,34046,467 MW<0.1%
United Kingdom1,314th of 5,834200,500 MW<0.1%
All power plants in our data5,977th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 5 grid connections (3 operating, 24.8 MW), 3 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Cross Border Connection (England)Transmission line—Planned36 km
Kielder Hydro grid connectionGrid connection5.6 MWOperating40 km
KielderSubstation——43 km
Hydro 6 MW grid connection at Kielder HydroGrid connection6 MWOperating43 km
Kinkry HillSubstation——44 km
Land at High Park Foot grid connectionGrid connection21.1 MWPlanned45 km
EastonSubstation——46 km