Substation · Scotland, United Kingdom
Commercial Road Substation
Commercial Road Substation is a 33 kV primary substation in Scotland, United Kingdom, with 1.62 MVA of demand headroom, operated by SP Distribution plc (SP Energy Networks, South and Central Scotland licence area).
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | COMMERCIAL ROAD | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Location | Scotland | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Grid operator | SP Distribution plc (SP Energy Networks, South and Central Scotland licence area) | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Demand headroom | 1.62 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Firm capacity | 13.5 MVA | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Level | Primary substation | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Voltage | 33 kV (levels 33, 11 kV) | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
| Coordinates | 55.4247, -2.7893 | SP Energy Networks open data portal · CC BY 4.0 · checked 25 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Nearby
Within 50 km of this substation: 127 power plants (29 operating, 1,288 MW), 35 grid connections (18 operating, 398 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Stirches Farm PV grid connection | Grid connection | 60 MW | Planned | 1.3 km |
| Stirches Renewable Energy Park - Solar Panels & Battery Energy Storage | Power plant | 30 MW | Planned | 1.6 km |
| Stirches Renewable Energy Park - Solar Panels & Battery Energy Storage | Power plant | 30 MW | Planned | 1.6 km |
| Birneyknowe Wind Farm | Power plant | 60 MW | Cancelled | 5.8 km |
| Pines Burn Windfarm (Fernilees Windfarm) grid connection | Grid connection | 52.8 MW | Operating | 10 km |
| Langhope Rig Windfarm grid connection | Grid connection | 16.2 MW | Operating | 11 km |
| Cross Border Connection (England) | Transmission line | — | Planned | 31 km |
Grid operator and place
More from SP Distribution plc
- Abbeylands Roadsubstation
- Abronhillsubstation
- Airdriesubstation
- Allanbanksubstation
- Almondvalesubstation
- Annansubstation
- Anstruthersubstation
- Archerhill Roadsubstation
Candidate sites around this substation
1 site of land near Commercial Road has it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 2.01 ha brownfield site at Guthrie Drive Hawick, Scottish Borders1.32 km · score 12
Other substations in Scotland
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.