Power plant · Aberdeenshire, Scotland, United Kingdom

Bankhead Recycling - Solar Array, Battery Storage & Hydrogen

Bankhead Recycling - Solar Array, Battery Storage & Hydrogen is a permitted power plant in Aberdeenshire, Scotland, United Kingdom, with 5 MW of capacity, operated by Bankhead Renewable Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBankhead Recycling & Waste Management Duffshill Road Portlethen, AB12 4RXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Apr 2023 (permit APP/2022/1697, Town and Country Planning Act, issued by Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Aug 2022 (reference APP/2022/1697, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Apr 2023 (granted, reference APP/2022/1697, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBankhead Renewable Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.0902, -2.1221DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Aberdeenshire, reference APP/2022/1697)
  2. Permit applied for (planning authority Aberdeenshire, reference APP/2022/1697)

How it compares

Bankhead Recycling - Solar Array, Battery Storage & Hydrogen is the 739th-largest of 872 power plants planned, permitted or under construction in Scotland and the 2,484th-largest of 3,222 in the United Kingdom by capacity; its 5 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland739th of 87299,272 MW<0.1%
United Kingdom2,484th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,616th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 94 grid connections (36 operating, 321 MW), 72 substations and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Drumforskie PV grid connectionGrid connection2 MWPlanned2.0 km
Rigifa Farm grid connectionGrid connection60 MWPlanned2.4 km
Redmoss PrimarySubstation——2.7 km
Redmoss GSPSubstation——2.7 km
Kincardine Offshore Windfarm grid connectionGrid connection49.6 MWOperating3.3 km
Kincorth PrimarySubstation——3.8 km
BrightsolidData center——7.3 km

Operator and place

More from Bankhead Renewable Energy Limited

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page