Power plant · Stirling, Scotland, United Kingdom

Acharn Forest - Battery Storage

Acharn Forest - Battery Storage is a permitted power plant in Stirling, Scotland, United Kingdom, with 9.9 MW of capacity, operated by Biomass Energy Renewables Llp.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStirling (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAcharn Forest, Killin, Tayside, lomond, FK21 8RADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Jan 2024 (permit 2023/0372/DET, Town and Country Planning Act, issued by Stirling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Nov 2023 (reference 2023/0372/DET, planning authority Stirling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Jan 2024 (granted, reference 2023/0372/DET, planning authority Stirling)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBiomass Energy Renewables LlpDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity9.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.4492, -4.3419DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Acharn Forest - Battery Storage is the 701st-largest of 872 power plants planned, permitted or under construction in Scotland and the 2,317th-largest of 3,222 in the United Kingdom by capacity; its 9.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland701st of 87299,272 MW<0.1%
United Kingdom2,317th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,409th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 47 grid connections (34 operating, 382 MW) and 44 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Killin Town PrimarySubstation——2.0 km
Killin GSPSubstation——3.2 km
Ardchyle PrimarySubstation——3.5 km
Boreland Energy Storage Park grid connectionGrid connection48 MWPlanned3.7 km
Morenish grid connectionGrid connection49.4 MWPlanned4.3 km
Glen Dochart grid connectionGrid connection2 MWOperating7.5 km

Operator and place

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom