Power plant · Braintree, England, United Kingdom
Wren Power and Pulp (Rivenhall Airfield) Power Station
Wren Power and Pulp (Rivenhall Airfield) Power Station is a biomass power plant under construction in Braintree, England, United Kingdom, with 1.8 MW of capacity, operated by Gent Fairhead Environmental Services.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Braintree (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Woodhouse Farm, Near Braintree | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 2 Mar 2010 (permit ESS/37/08/BTE, Town and Country Planning Act, issued by Braintree) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 8 Sept 2008 (reference ESS/37/08/BTE, planning authority Braintree) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 2 Mar 2010 (granted, reference ESS/37/08/BTE, planning authority Braintree) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Gent Fairhead Environmental Services | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.8 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Anaerobic Digestion | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.8537, 0.6504 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Construction started
- Permit granted (planning authority Braintree, reference ESS/37/08/BTE)
- Permit applied for (planning authority Braintree, reference ESS/37/08/BTE)
How it compares
Wren Power and Pulp (Rivenhall Airfield) is the 1,459th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,307th-largest of 2,548 in the United Kingdom by capacity; its 1.8 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,459th of 1,650 | 171,264 MW | <0.1% |
| United Kingdom | 2,307th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,532nd of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 6 data centers, 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bramford to Twinstead | Transmission line | — | Permitted | 22 km |
| CityFibre Cabinets | Data center | — | — | 32 km |
| Imperium 315 | Data center | — | — | 32 km |
| NVIDIA Cambridge-1 | AI supercomputer | 202 H100e | Operating | 37 km |
| Kao Data KLON-02 | Data center | — | — | 37 km |
Operator and place
More from Gent Fairhead Environmental Services
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.