Power plant · East Riding of Yorkshire, England, United Kingdom

Withernwick extension Wind Farm

Withernwick extension Wind Farm is a wind power plant in East Riding of Yorkshire, England, United Kingdom, with 8.2 MW of capacity, operated by Energiekontor UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Riding of Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North And North East Homer House Aldbrough Road Withernwick East Riding Of YorkshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2019DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Dec 2016 (permit 14/01919/STPLFE, Town and Country Planning Act, issued by East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Jun 2014 (reference 14/01919/STPLFE, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Jun 2015 (refused, reference 14/01919/STPLFE, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Dec 2016 (granted, reference 14/01919/STPLFE, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Dec 2016 (appeal granted, reference 14/01919/STPLFE, planning authority East Riding of Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnergiekontor UKDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units4 units (2.05 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.8599, -0.1622DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority East Riding of Yorkshire, reference 14/01919/STPLFE)
  3. Permit granted (appeal granted, planning authority East Riding of Yorkshire, reference 14/01919/STPLFE)
  4. Permit refused (planning authority East Riding of Yorkshire, reference 14/01919/STPLFE)
  5. Permit applied for (planning authority East Riding of Yorkshire, reference 14/01919/STPLFE)

How it compares

Withernwick extension is the 1,715th-largest of 4,035 power plants in England and the 2,670th-largest of 5,834 in the United Kingdom by capacity; its 8.2 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,715th of 4,035134,434 MW<0.1%
United Kingdom2,670th of 5,834200,500 MW<0.1%
All power plants in our data11,090th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 217 grid connections (109 operating, 1,913 MW), 102 substations, 1 gas storage facility and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.

NameKindSizeStatusDistance
Aldbrough Road grid connectionGrid connection8.2 MWOperating1.2 km
Aldbrough Road grid connectionGrid connection18.1 MWOperating1.2 km
Biomass 22 MW grid connection at Tansterne GenerationGrid connection22 MWOperating4.5 km
SeatonSubstation——6.4 km
Aldbrough Hydrogen StorageGas storage facility—Planned7.7 km
Burton PidseaSubstation——11 km
HoldernessSubstation——12 km
Continental Link Multi-Purpose InterconnectorTransmission line—Cancelled18 km

Operator and place

More from Energiekontor UK

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page