Power plant · East Suffolk, England, United Kingdom

Wissett Solar Farm, Wissett - Solar Photovoltaic (PV) Farm (Apple Tree)

Wissett Solar Farm, Wissett - Solar Photovoltaic (PV) Farm (Apple Tree) is a permitted power plant in East Suffolk, England, United Kingdom, with 27 MW of capacity, operated by Pathfinder Clean Energy UK Dev Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Suffolk (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressUKZ139 BC Wissett Solar Farm, Grays Lane, Wissett, IP19 0RADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Feb 2025 (permit DC/22/3313/FUL, Town and Country Planning Act, issued by East Suffolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Sept 2022 (reference DC/22/3313/FUL, planning authority East Suffolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Feb 2025 (granted, reference DC/22/3313/FUL, planning authority East Suffolk)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPathfinder Clean Energy UK Dev LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity27 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area87.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.3536, 1.4887DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Wissett Solar Farm, Wissett - Solar Photovoltaic (PV) Farm (Apple Tree) is the 1,090th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,716th-largest of 3,222 in the United Kingdom by capacity; its 27 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,090th of 2,174186,088 MW<0.1%
United Kingdom1,716th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data3,310th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 2 transmission lines, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
LionLink InterconnectorTransmission line—Planned18 km
Norwich to TilburyTransmission line—Planned29 km

Operator and place

More from Pathfinder Clean Energy UK Dev Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page