Power plant · Cotswold, England, United Kingdom
Willersey solar farm
Willersey solar farm is a power plant in Cotswold, England, United Kingdom, with 1 MW of capacity, operated by Belectric UK.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cotswold (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land Parcel To The North Of The Byre Badsey Lane Willersey Gloucestershire, WR12 7PJ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2019 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 23 Dec 2016 (permit 16/04853/FUL, Town and Country Planning Act, issued by Cotswold) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 22 Nov 2016 (reference 16/04853/FUL, planning authority Cotswold) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 23 Dec 2016 (granted, reference 16/04853/FUL, planning authority Cotswold) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Belectric UK | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.0550, -1.8447 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Willersey solar farm is the 3,301st-largest of 3,430 power plants in England and the 4,866th-largest of 5,050 in the United Kingdom by capacity; its 1 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 3,301st of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,866th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 11,790th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 16/04853/FUL
- Started operating
Nearby
Within 50 km of this power plant: 248 grid connections (31 operating, 437 MW), 33 substations and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Rainbows Farm grid connection | Grid connection | — | — | 1.2 km |
| Broadway, Buckland Garden Nursery grid connection | Grid connection | — | — | 4.5 km |
| Northwick Estate grid connection | Grid connection | — | — | 5.3 km |
| Shipton Oliffe Primary | Substation | — | — | 22 km |
| Rissington Primary | Substation | — | — | 22 km |
| Bledington Primary | Substation | — | — | 23 km |
| Ionos data center, England | Data center | — | — | 27 km |
| Evoque Data Center Solutions | Data center | — | — | 29 km |
| DXC Technology | Data center | — | — | 48 km |
Operator and place
More from Belectric UK
- Nevendon10 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.