Power plant · East Devon, England, United Kingdom

Westexe, Greendale Business Park - Solar Panels

Westexe, Greendale Business Park - Solar Panels is a cancelled solar power plant in East Devon, England, United Kingdom, with 1.1 MW of capacity, operated by Olympus Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Devon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWestexe, Greendale Business Park, Woodbury Salterton, Exeter, EX5 1EWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Feb 2024 (permit 23/2707/PVJ, Town and Country Planning Act, issued by East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Jan 2024 (reference 23/2707/PVJ, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Feb 2024 (granted, reference 23/2707/PVJ, planning authority East Devon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorOlympus Power (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.7001, -3.3953DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority East Devon, reference 23/2707/PVJ)
  2. Permit applied for (planning authority East Devon, reference 23/2707/PVJ)

How it compares

Westexe, Greendale Business Park - Solar Panels is the 3,841st-largest of 4,036 power plants in England and the 5,573rd-largest of 5,837 in the United Kingdom by capacity; its 1.1 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,841st of 4,036134,406 MW<0.1%
United Kingdom5,573rd of 5,837200,833 MW<0.1%
All power plants in our data12,646th of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 2 grid connections and 1 substation, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Newlands Power Plant grid connectionGrid connection52.5 MWPlanned33 km
Axminster GSPSubstation——35 km
Pipplepen Farm Solar PV grid connectionGrid connection32.6 MWPlanned49 km

Operator and place

More from Olympus Power

Other power plants in England

All 5876 power plants in England, United Kingdom