Power plant · West Northamptonshire, England, United Kingdom
West Lodge Farm
West Lodge Farm is a cancelled power plant in West Northamptonshire, England, United Kingdom, with 2 MW of capacity, operated by Northamptonshire County Council.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | West Northamptonshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Blisworth Road, Courteenhall | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (abandoned) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 30 Oct 2008 (permit S/2008/1430/PCC, Town and Country Planning Act, issued by West Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 13 Oct 2008 (reference S/2008/1430/PCC, planning authority West Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 30 Oct 2008 (granted, reference S/2008/1430/PCC, planning authority West Northamptonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Northamptonshire County Council | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Anaerobic Digestion | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.1718, -0.9004 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
West Lodge Farm is the 2,789th-largest of 3,430 power plants in England and the 4,162nd-largest of 5,050 in the United Kingdom by capacity; its 2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,789th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,162nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 10,416th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 239 grid connections (14 operating, 115 MW), 16 substations and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Blisworth Hill PV Farm grid connection | Grid connection | — | — | 1.7 km |
| Northampton Gateway, 8MW PV grid connection | Grid connection | — | — | 2.0 km |
| M1 Windfarm grid connection | Grid connection | — | — | 2.8 km |
| Hellermann Tyton Data | Data center | — | — | 7.1 km |
| nLighten Milton Keynes | Data center | — | — | 15 km |
| Data center, England (OSM way 460010263) | Data center | — | — | 16 km |
| East Claydon GSP | Substation | — | — | 27 km |
| Cottisford Primary | Substation | — | — | 27 km |
| Bicester North Primary | Substation | — | — | 33 km |
Operator and place
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.