Power plant · Cumberland, England, United Kingdom
Weddicar Rigg Wind Farm
Weddicar Rigg Wind Farm is a cancelled power plant in Cumberland, England, United Kingdom, with 12 MW of capacity, operated by Banks Renewables.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cumberland (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | LAND TO THE WEST OF STEEL BROW ROAD, (KNOWN AS WEDDICAR RIGG), ARLECDON, FRIZINGTON | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (appeal refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 6 Oct 2011 (reference 4/11/2485/0F1, planning authority Cumberland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 17 Oct 2012 (refused, reference 4/11/2485/0F1, planning authority Cumberland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 12 Dec 2013 (appeal refused, reference 4/11/2485/0F1, planning authority Cumberland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Banks Renewables | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 12 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 6 units (2 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 54.5609, -3.5207 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Weddicar Rigg Wind Farm is the 931st-largest of 3,430 power plants in England and the 1,630th-largest of 5,050 in the United Kingdom by capacity; its 12 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 931st of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 1,630th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 6,154th of 12,008 | 1,173,302 MW | <0.1% |
Nearby
Within 50 km of this power plant: 83 grid connections (48 operating, 639 MW), measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Weddicar Solar Farm 31MW NON-Firm grid connection | Grid connection | 32.6 MW | Planned | 1.7 km |
| Dissington Moss Wind Farm grid connection | Grid connection | 36 MW | Planned | 2.0 km |
| Fairfield Wind Farm grid connection | Grid connection | 6.5 MW | Operating | 2.2 km |
Operator and place
More from Banks Renewables
- Pond Industrial Park, Whitburn Road - Pond Battery Storage200 MW · permitted
- Kype Muir Wind Farm88.4 MW
- Kype Muir Wind Farm Extension67.2 MW
- Lethans Wind Farm Extension66 MW · permitted
- Birneyknowe Wind Farm60 MW
- Middle Muir Wind Farm51 MW
- Mill Rig Wind Farm36 MW · under construction
- High Cumnock Wind Farm27.2 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.