Waverley Wood II Power Station is a biomass power plant in Warwick, England, United Kingdom, with 2.4 MW of capacity, operated by Energy Developments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWarwick (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWaverley Wood Farm, Weston Lane, Coventry, West MidlandsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2004DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date14 Oct 1999 (Town and Country Planning Act, issued by Warwick)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Jun 1999 (planning authority Warwick)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date14 Oct 1999 (granted, planning authority Warwick)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnergy Developments (ENERGY DEVELOPMENTS (UK) LTD)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyLandfill GasDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.3401, -1.4686DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Warwick)
  3. Permit applied for (planning authority Warwick)

How it compares

Waverley Wood II is the 3,194th-largest of 4,035 power plants in England and the 4,639th-largest of 5,834 in the United Kingdom by capacity; its 2.4 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,194th of 4,035134,434 MW<0.1%
United Kingdom4,639th of 5,834200,500 MW<0.1%
All power plants in our data13,737th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 9 grid connections (6 operating, 39.3 MW), 8 data centers and 5 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Data center, England (OSM way 710050084)Data center——23 km
Evoque Data Center SolutionsData center——28 km
Santander data center, EnglandData center——32 km
Deddington PrimarySubstation——42 km
Hill Farm PV grid connectionGrid connection4.51 MWOperating43 km
Duns TEW Solar Farm grid connectionGrid connection6 MWPlanned43 km
Spring Farm grid connectionGrid connection13.2 MWPlanned44 km
Chipping Norton PrimarySubstation——45 km
Cottisford PrimarySubstation——46 km

Operator and place

More from Energy Developments

Other power plants in England

All 5872 power plants in England, United Kingdom