Power plant · Forest of Dean, England, United Kingdom

Vantage Point

Vantage Point is a power plant in Forest of Dean, England, United Kingdom, with 1.4 MW of capacity, operated by Bee Green Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationForest of Dean (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBuilding 1, Vantage Point Business Village Mitcheldean, GL17 0DDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2011DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Jun 2011 (permit P0825/11/FUL, Town and Country Planning Act, issued by Forest of Dean)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date3 May 2011 (reference P0825/11/FUL, planning authority Forest of Dean)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Jun 2011 (granted, reference P0825/11/FUL, planning authority Forest of Dean)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBee Green SolarDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1.4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8681, -2.4826DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Forest of Dean, reference P0825/11/FUL)
  3. Permit applied for (planning authority Forest of Dean, reference P0825/11/FUL)

How it compares

Vantage Point is the 3,139th-largest of 3,430 power plants in England and the 4,668th-largest of 5,050 in the United Kingdom by capacity; its 1.4 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England3,139th of 3,43071,965 MW<0.1%
United Kingdom4,668th of 5,050115,622 MW<0.1%
All power plants in our data11,288th of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 28 grid connections (15 operating, 301 MW), 14 substations, 3 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
DXC TechnologyData center——0.4 km
Tetbury PrimarySubstation——34 km
Shipton Oliffe PrimarySubstation——37 km
nLighten BristolData center——37 km
Kemble RAF PrimarySubstation——37 km
Marsh Farm B PV grid connectionGrid connection11.4 MWOperating38 km
Long Newton PV grid connectionGrid connection5.8 MWOperating38 km
Sunstroom grid connectionGrid connection4.28 MWOperating38 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating41 km