Power plant · East Cambridgeshire, England, United Kingdom

Triangle Solar Farm Park

Triangle Solar Farm Park is a power plant in East Cambridgeshire, England, United Kingdom, with 12 MW of capacity, operated by Cambridge County Council.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEast Cambridgeshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTriangle Farm, Soham, Cambridgeshire, CB7 5HXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2017DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date8 Oct 2014 (permit 14/00779/FUM, Town and Country Planning Act, issued by East Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Jul 2014 (reference 14/00779/FUM, planning authority East Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date8 Oct 2014 (granted, reference 14/00779/FUM, planning authority East Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCambridge County CouncilDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area28.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.3290, 0.3207DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Triangle Solar Farm Park is the 931st-largest of 3,430 power plants in England and the 1,630th-largest of 5,050 in the United Kingdom by capacity; its 12 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England931st of 3,43071,985 MW<0.1%
United Kingdom1,630th of 5,050115,642 MW<0.1%
All power plants in our data6,154th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 14/00779/FUM
  2. Started operating

Nearby

Within 50 km of this power plant: 6 data centers, 4 grid connections and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Redcentric CambridgeData center——16 km
US Air Force data center, BrandonData center——17 km
West Cambridge Data CentreData center——21 km
Kings Lynn B Connection ProjectTransmission line—Permitted44 km
Crowland, French Farm Wind Farm grid connectionGrid connection——47 km
The Grange Wind Farm grid connectionGrid connection——48 km
FEN Dyke Farm grid connectionGrid connection——49 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom