Power plant · Tewkesbury, England, United Kingdom
Tredington House Farm, Tredington - Battery Energy Storage Facility
Tredington House Farm, Tredington - Battery Energy Storage Facility is a permitted power plant in Tewkesbury, England, United Kingdom, with 40 MW of capacity, operated by Greenfield Energy Developments Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Tewkesbury (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Part Parcel 7800 Tredington, GL20 7BU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 10 Dec 2024 (permit 24/00411/FUL, Town and Country Planning Act, issued by Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 16 May 2024 (reference 24/00411/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 10 Dec 2024 (granted, reference 24/00411/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Greenfield Energy Developments Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 40 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.9609, -2.1344 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Tredington House Farm, Tredington - Battery Energy Storage Facility is the 836th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 836th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,342nd of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,556th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 57 grid connections (32 operating, 485 MW), 36 substations and 6 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Shipton Oliffe Primary | Substation | — | — | 16 km |
| Northleach Primary | Substation | — | — | 25 km |
| DXC Technology | Data center | — | — | 26 km |
| Ionos data center, England | Data center | — | — | 27 km |
| Whiteway Primary | Substation | — | — | 28 km |
| Bathurst Estates grid connection | Grid connection | 49.9 MW | Operating | 29 km |
| Cirencester Solar Park grid connection | Grid connection | 25 MW | Planned | 29 km |
| Crucis Park Estate LLP grid connection | Grid connection | 12.6 MW | Planned | 30 km |
| Evoque Data Center Solutions | Data center | — | — | 43 km |
Operator and place
More from Greenfield Energy Developments Limited
- Thornton Battery Storage400 MW · permitted
- Mulbarton Road, Keswick - Battery Energy Storage System400 MW · planned
- Forty Acre Wood, The Street - Battery Energy Storage System300 MW
- Buildwas - Battery Energy Storage100 MW · permitted
- Grendon Road, Earls Barton - Battery Energy Storage System99.9 MW · permitted
- Butterfly Lane, Elstree BESS - Battery Energy Storage System99.9 MW · planned
- Canalside - Battery Storage System60 MW · permitted
- Far Moor - Battery Energy Storage System50 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.