Power plant · Coventry, England, United Kingdom

Torrington Avenue Battery Storage Facility

Torrington Avenue Battery Storage Facility is a permitted power plant in Coventry, England, United Kingdom, with 30 MW of capacity, operated by Power Initiatives Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCoventry (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTorrington Avenue, Coventry, CV4 9GRDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date15 Apr 2024 (permit PL/2024/0000114/FULM, Town and Country Planning Act, issued by Coventry)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Jan 2024 (reference PL/2024/0000114/FULM, planning authority Coventry)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Apr 2024 (granted, reference PL/2024/0000114/FULM, planning authority Coventry)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPower Initiatives LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.3985, -1.5689DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Torrington Avenue Battery Storage Facility is the 991st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England991st of 2,174186,088 MW<0.1%
United Kingdom1,569th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data2,981st of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 384 grid connections and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Coventry West Energy Park grid connectionGrid connection——2.9 km
Nailcote Farm, Land East of grid connectionGrid connection——3.1 km
Berkswell Energy Centre grid connectionGrid connection——3.2 km
Data center, England (OSM way 710050084)Data center——20 km
Evoque Data Center SolutionsData center——23 km
Santander data center, EnglandData center——32 km

Operator and place

More from Power Initiatives Limited

Other power plants in England

All 5809 power plants in England, United Kingdom