Power plant · Central Bedfordshire, England, United Kingdom
Toddington Services, Hipsey Spinney - Battery Storage
Toddington Services, Hipsey Spinney - Battery Storage is a permitted battery storage plant in Central Bedfordshire, England, United Kingdom, with 250 MW of capacity, operated by Kona Energy Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Central Bedfordshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | S/O Toddington Services, W/O The M1 Motorway & E/O Hipsey Spinney, Dunstable, LU5 6HP | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 6 Jan 2025 (permit CB/24/00414/FULL, Town and Country Planning Act, issued by Central Bedfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 15 Feb 2024 (reference CB/24/00414/FULL, planning authority Central Bedfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 6 Jan 2025 (granted, reference CB/24/00414/FULL, planning authority Central Bedfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Kona Energy Limited (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 250 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.9444, -0.4979 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Central Bedfordshire, reference CB/24/00414/FULL)
- Permit applied for (planning authority Central Bedfordshire, reference CB/24/00414/FULL)
How it compares
Toddington Services, Hipsey Spinney - Battery Storage is the 154th-largest of 1,650 power plants planned, permitted or under construction in England and the 237th-largest of 2,548 in the United Kingdom by capacity; its 250 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 154th of 1,650 | 171,264 MW | 0.15% |
| United Kingdom | 237th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 593rd of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 82 data centers (1 operating, 88 MW), 67 substations, 41 grid connections (24 operating, 266 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Data center, Dunstable (OSM way 526426719) | Data center | — | — | 5.2 km |
| NTT Hemel Hempstead 2 | Data center | — | — | 20 km |
| Starwood House | Data center | — | — | 20 km |
| East Claydon GSP | Substation | — | — | 28 km |
| Cokes Lane Primary | Substation | — | — | 31 km |
| Amersham GSP | Substation | — | — | 33 km |
| Generation 99 MW grid connection at Amersham Main | Grid connection | 99 MW | Planned | 34 km |
| Pembridge Farm grid connection | Grid connection | 131 MW | Planned | 38 km |
| Derehams Farm grid connection | Grid connection | 100 MW | Planned | 39 km |
Operator and place
More from Kona Energy Limited
- Smeaton Battery Energy Storage System228 MW · permitted
- Heysham Energy Storage Project200 MW
Other power plants in England
- Drax Power Station Biomass Units2,580 MW
- Ratcliffe-on-Soar2,021 MW
- Cottam2,000 MW
- Walpole Flexible Generation Project2,000 MW
- West Burton2,000 MW
- Eggborough1,960 MW
- Staythorpe1,828 MW
- Fiddler’s Ferry1,510 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.