Power plant · Thurrock, England, United Kingdom

Tilbury Docks - Phase 2 (EfW)

Tilbury Docks - Phase 2 (EfW) is a cancelled power plant in Thurrock, England, United Kingdom, with 30 MW of capacity, operated by Tilbury Green Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationThurrock (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressTilbury Docks, Essex, RM18 7HPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date27 Aug 2009 (Town and Country Planning Act, issued by Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Feb 2008 (planning authority Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Aug 2009 (granted, planning authority Thurrock)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTilbury Green PowerDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.4648, 0.3490DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit expired
  2. Permit granted (planning authority Thurrock)
  3. Permit applied for (planning authority Thurrock)

How it compares

Tilbury Docks - Phase 2 (EfW) is the 386th-largest of 3,430 power plants in England and the 727th-largest of 5,050 in the United Kingdom by capacity; its 30 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England386th of 3,43071,965 MW<0.1%
United Kingdom727th of 5,050115,622 MW<0.1%
All power plants in our data2,805th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 75 data centers (1 operating, 88 MW), 22 substations, 4 grid connections (2 operating, 9.14 MW), 1 transmission line and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fujitsu Data CentreData center——5.8 km
CustodianDC DA2Data center——6.4 km
OVH data center, EnglandData center——13 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating19 km
Tertiary Study grid connectionGrid connection57 MWPlanned31 km
North London (Electricity Line) ReinforcementTransmission line—Permitted31 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating37 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating40 km
Goldsmiths PrimarySubstation——42 km