Power plant · Hinckley and Bosworth, England, United Kingdom
Thornton Lane
Thornton Lane is a power plant in Hinckley and Bosworth, England, United Kingdom, with 2.7 MW of capacity, operated by Green Hedge.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Hinckley and Bosworth (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land East Of, Thornton Lane, Stanton Under Bardon, Markfield, Leicestershire, LE67 9TU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 8 Sept 2015 (permit 15/00645/FUL, Town and Country Planning Act, issued by Hinckley and Bosworth) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 9 Jun 2015 (reference 15/00645/FUL, planning authority Hinckley and Bosworth) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 8 Sept 2015 (granted, reference 15/00645/FUL, planning authority Hinckley and Bosworth) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Green Hedge (Green Hedge (BayWa r.e.)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2.7 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 6.86 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.6850, -1.3112 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Thornton Lane is the 2,631st-largest of 3,430 power plants in England and the 3,877th-largest of 5,050 in the United Kingdom by capacity; its 2.7 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,631st of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 3,877th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 9,879th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 15/00645/FUL
- Started operating
Nearby
Within 50 km of this power plant: 384 grid connections, 6 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Thornton Lane Solar Farm grid connection | Grid connection | — | — | 0.3 km |
| Aggregate Industries grid connection | Grid connection | — | — | 2.1 km |
| Stanton Under Bardon Solar & Storage grid connection | Grid connection | — | — | 2.1 km |
| Santander data center, England | Data center | — | — | 13 km |
| Santander data center, England | Data center | — | — | 14 km |
| Data center, England (OSM way 710050084) | Data center | — | — | 17 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 27 km |
| Chesterfield to Willington | Transmission line | — | Planned | 40 km |
Operator and place
More from Green Hedge
- Catsbrain Farm30 MW
- Lower Stanley Farm4 MW
- Wormit Solar Farm4 MW
- Reydon Farm3.9 MW
- Taunton Racecourse1.5 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.