Power plant · Malvern Hills, England, United Kingdom

The Waddings, Knighton-On-Teme - Battery Energy Storage System

The Waddings, Knighton-On-Teme - Battery Energy Storage System is a planned battery storage plant in Malvern Hills, England, United Kingdom, with 60 MW of capacity, operated by Integrum SPV 22298 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationMalvern Hills (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe Waddings, Knighton-On-Teme, Tenbury Wells, WR15 8LYDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date4 Dec 2024 (reference M/24/01660/FUL, planning authority Malvern Hills)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorIntegrum SPV 22298 Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity60 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.3271, -2.5373DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Malvern Hills, reference M/24/01660/FUL)

How it compares

The Waddings, Knighton-On-Teme - Battery Energy Storage System is the 343rd-largest of 1,650 power plants planned, permitted or under construction in England and the 618th-largest of 2,548 in the United Kingdom by capacity; its 60 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England343rd of 1,650171,264 MW<0.1%
United Kingdom618th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,624th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 4 data centers, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Ionos data center, EnglandData center——29 km
EE Data CentreData center——42 km
Hutchison 3GData center——42 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page