Power plant · South Kesteven, England, United Kingdom

Temple Hill Wind Farm

Temple Hill Wind Farm is a cancelled power plant in South Kesteven, England, United Kingdom, with 15 MW of capacity, operated by Npower Renewables and RWE.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Kesteven (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHough Grange Farm, Hough-on-the-hill, Grantham, NG322ANDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Oct 2013 (reference S13/2699, planning authority South Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Mar 2015 (refused, reference S13/2699, planning authority South Kesteven)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNpower Renewables (RWE / npower renewables)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRWE (RWE / npower renewables)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity15 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units5 units (3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.0144, -0.6654DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority South Kesteven, reference S13/2699)
  2. Permit applied for (planning authority South Kesteven, reference S13/2699)

How it compares

Temple Hill Wind Farm is the 774th-largest of 3,430 power plants in England and the 1,388th-largest of 5,050 in the United Kingdom by capacity; its 15 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England774th of 3,43071,965 MW<0.1%
United Kingdom1,388th of 5,050115,622 MW<0.1%
All power plants in our data5,118th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 12 grid connections (10 operating, 25.8 MW), 8 substations, 3 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Digital Space DC - NewarkData center——11 km
Hall Water Treatment Works grid connectionGrid connection1.6 MWOperating28 km
Newton on Trent Water Works grid connectionGrid connection3.1 MWOperating29 km
Triton Knoll Electrical SystemTransmission line—Permitted31 km
Weston Marsh to East LeicestershireTransmission line—Planned31 km
StowSubstation——34 km
Stow Park Road grid connectionGrid connection1.19 MWOperating34 km
ExperianData center——35 km
nLighten NottinghamData center——37 km

Operators and place

More from Npower Renewables

Other power plants in England

All 5809 power plants in England, United Kingdom