Tedder Hill Wind cluster is a power plant in East Riding of Yorkshire, England, United Kingdom, with 7.5 MW of capacity, operated by Ventient.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Riding of Yorkshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | near Roos, East Riding of Yorkshire | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2013 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 28 Jan 2010 (permit 06/03729/STPLF, Town and Country Planning Act, issued by East Riding of Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 11 May 2006 (ref. 06/03729/STPLF, East Riding of Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Jan 2010 (appeal granted, ref. 06/03729/STPLF, East Riding of Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 12 Sept 2008 (refused, ref. 06/03729/STPLF, East Riding of Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 28 Jan 2010 (granted, ref. 06/03729/STPLF, East Riding of Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Ventient | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 7.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 3 units | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.7531, -0.0231 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Tedder Hill Wind cluster is the 1,425th-largest of 3,430 power plants in England and the 2,284th-largest of 5,050 in the United Kingdom by capacity; its 7.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,425th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 2,284th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 7,732nd of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 06/03729/STPLF
- Started operating
Nearby
Within 50 km of this power plant: 195 grid connections (100 operating, 1,592 MW), 94 substations, 1 CO2 emitter and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wind 17.1 MW grid connection at Roos Windfarm | Grid connection | 17.1 MW | Operating | 1.5 km |
| Wind 6.555 MW grid connection at Withernsea | Grid connection | 6.56 MW | Operating | 2.3 km |
| Withernsea | Substation | — | — | 4.5 km |
| Burton Pidsea | Substation | — | — | 5.3 km |
| Solar 4.75 MW grid connection at Patrington Road | Grid connection | 4.75 MW | Operating | 6.6 km |
| Patrington Road | Substation | — | — | 6.7 km |
| Aldbrough Hydrogen Storage | CO2 emitter | — | Planned | 7.3 km |
| Continental Link Multi-Purpose Interconnector | Transmission line | — | Cancelled | 26 km |
Operator and place
More from Ventient
- Galawhistle66 MW
- Musdale Wind Farm64 MW
- North Steads Wind Farm18.5 MW
- Tibberchindy Wind Farm18 MW
- Glentaggart Wind Farm17 MW
- Wingates Wind Farm15 MW
- Mynydd Pen-y-Graig Wind Farm15 MW
- Gordonstown Hill Wind Farm12.5 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.