Power plant · Charnwood, England, United Kingdom

Syston Road - Solar Farm

Syston Road - Solar Farm is a solar power plant under construction in Charnwood, England, United Kingdom, with 26 MW of capacity, operated by Barber Farm Partnership.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCharnwood (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSyston Road, LE7 4UZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date12 Aug 2022 (permit P/21/2661/2, Town and Country Planning Act, issued by Charnwood)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date8 Feb 2022 (reference P/21/2661/2, planning authority Charnwood)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Aug 2022 (granted, reference P/21/2661/2, planning authority Charnwood)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBarber Farm PartnershipDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity26 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area46.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.7111, -1.0928DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Charnwood, reference P/21/2661/2)
  3. Permit applied for (planning authority Charnwood, reference P/21/2661/2)

How it compares

Syston Road - Solar Farm is the 895th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,456th-largest of 2,548 in the United Kingdom by capacity; its 26 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England895th of 1,650171,264 MW<0.1%
United Kingdom1,456th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data3,089th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Weston Marsh to East LeicestershireTransmission line—Planned13 km
Santander data center, EnglandData center——16 km
Santander data center, EnglandData center——17 km
ExperianData center——19 km
Chesterfield to WillingtonTransmission line—Planned43 km