Power plant · Rushcliffe, England, United Kingdom
Stoke Bardolph energy crop (Farm AD)
Stoke Bardolph energy crop (Farm AD) is a power plant in Rushcliffe, England, United Kingdom, with 2 MW of capacity, operated by Severn Trent Water.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Rushcliffe (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Stoke Bardolf, | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2010 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 11 Mar 2009 (permit 2008/0928, Town and Country Planning Act, issued by Gedling) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 18 Feb 2009 (reference 2008/0928, planning authority Gedling) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 11 Mar 2009 (granted, reference 2008/0928, planning authority Gedling) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Severn Trent Water | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Anaerobic Digestion | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.9766, -1.0365 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Stoke Bardolph energy crop (Farm AD) is the 2,789th-largest of 3,430 power plants in England and the 4,162nd-largest of 5,050 in the United Kingdom by capacity; its 2 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,789th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,162nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 10,416th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 2008/0928
- Started operating
Nearby
Within 50 km of this power plant: 21 grid connections (11 operating, 155 MW), 18 substations, 5 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| nLighten Nottingham | Data center | — | — | 12 km |
| Experian | Data center | — | — | 13 km |
| Digital Space DC - Newark | Data center | — | — | 20 km |
| Weston Marsh to East Leicestershire | Transmission line | — | Planned | 21 km |
| Chesterfield to Willington | Transmission line | — | Planned | 28 km |
| Hall Water Treatment Works grid connection | Grid connection | 1.6 MW | Operating | 36 km |
| Newton on Trent Water Works grid connection | Grid connection | 3.1 MW | Operating | 38 km |
| Wind 20.22 MW grid connection at Pennyhill Windfarm | Grid connection | 20.2 MW | Operating | 41 km |
| Kiveton Park | Substation | — | — | 42 km |
Operator and place
More from Severn Trent Water
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.