Power plant · Warwick, England, United Kingdom

Sherbourne Warwick Solar (Hampton Lodge)

Sherbourne Warwick Solar (Hampton Lodge) is a cancelled solar power plant in Warwick, England, United Kingdom, with 20 MW of capacity, operated by Pelagic Energy Development.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWarwick (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressW/O A46 Sherbourne., CV35 8ABDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date25 Sept 2023 (permit W/22/0548, Town and Country Planning Act, issued by Warwick)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 May 2022 (reference W/22/0548, planning authority Warwick)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Sept 2023 (appeal granted, reference W/22/0548, planning authority Warwick)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date25 Sept 2023 (granted, reference W/22/0548, planning authority Warwick)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Aug 2022 (refused, reference W/22/0548, planning authority Warwick)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPelagic Energy Development (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area29.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.2577, -1.6245DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (appeal granted, planning authority Warwick, reference W/22/0548)
  2. Permit granted (planning authority Warwick, reference W/22/0548)
  3. Permit refused (planning authority Warwick, reference W/22/0548)
  4. Permit applied for (planning authority Warwick, reference W/22/0548)

How it compares

Sherbourne Warwick Solar (Hampton Lodge) is the 877th-largest of 4,035 power plants in England and the 1,479th-largest of 5,834 in the United Kingdom by capacity; its 20 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England877th of 4,035134,434 MW<0.1%
United Kingdom1,479th of 5,834200,500 MW<0.1%
All power plants in our data6,713th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 12 substations, 12 grid connections (8 operating, 48.1 MW) and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Evoque Data Center SolutionsData center——19 km
Data center, England (OSM way 710050084)Data center——36 km
Chipping Norton PrimarySubstation——36 km
Ionos data center, EnglandData center——37 km
Deddington PrimarySubstation——38 km
Hill Farm PV grid connectionGrid connection4.51 MWOperating38 km
Duns TEW Solar Farm grid connectionGrid connection6 MWPlanned38 km
Spring Farm grid connectionGrid connection13.2 MWPlanned39 km
Bledington PrimarySubstation——40 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom