Sawston Solar Farm (Land North of Dales Manor Business Park)

Sawston Solar Farm (Land North of Dales Manor Business Park) is a cancelled power plant in South Cambridgeshire, England, United Kingdom, with 14 MW of capacity, operated by Sawston Solar Farm.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Cambridgeshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North of Dales Manor Business Park, West Way, Sawston, CambridgeDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Oct 2014 (reference S/2409/14/FL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date12 Dec 2014 (refused, reference S/2409/14/FL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Jun 2016 (appeal refused, reference S/2409/14/FL, planning authority South Cambridgeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSawston Solar FarmDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity14 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area49.3 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.1359, 0.1849DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority South Cambridgeshire, reference S/2409/14/FL)
  2. Permit refused (planning authority South Cambridgeshire, reference S/2409/14/FL)
  3. Permit applied for (planning authority South Cambridgeshire, reference S/2409/14/FL)

How it compares

Sawston Solar Farm (Land North of Dales Manor Business Park) is the 838th-largest of 3,430 power plants in England and the 1,490th-largest of 5,050 in the United Kingdom by capacity; its 14 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England838th of 3,43071,965 MW<0.1%
United Kingdom1,490th of 5,050115,622 MW<0.1%
All power plants in our data5,490th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 8 data centers, 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
Redcentric CambridgeData center——11 km
West Cambridge Data CentreData center——11 km
Starwood HouseData center——32 km
NVIDIA Cambridge-1AI supercomputer202 H100eOperating41 km
Bramford to TwinsteadTransmission line—Permitted48 km

Operator and place

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page