Power plant · Teignbridge, England, United Kingdom

Sawmills Solar Farm

Sawmills Solar Farm is a power plant in Teignbridge, England, United Kingdom, with 6.5 MW of capacity, operated by Foresight.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTeignbridge (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSawmills, Ashcombe Estate, Ashcombe, Devon, EX7 0QDDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date7 Nov 2014 (permit 14/01576/MAJ, Town and Country Planning Act, issued by Teignbridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date30 May 2014 (reference 14/01576/MAJ, planning authority Teignbridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Nov 2014 (granted, reference 14/01576/MAJ, planning authority Teignbridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorForesightDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area28.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.5924, -3.5313DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Teignbridge, reference 14/01576/MAJ)
  3. Permit applied for (planning authority Teignbridge, reference 14/01576/MAJ)

How it compares

Sawmills Solar Farm is the 1,558th-largest of 3,430 power plants in England and the 2,473rd-largest of 5,050 in the United Kingdom by capacity; its 6.5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,558th of 3,43071,965 MW<0.1%
United Kingdom2,473rd of 5,050115,622 MW<0.1%
All power plants in our data8,001st of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 1 mine, 1 grid connection and 1 substation, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Tungsten WestMine——40 km
Newlands Power Plant grid connectionGrid connection52.5 MWPlanned46 km
Axminster GSPSubstation——48 km

Operator and place

More from Foresight

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page