Power plant · Newcastle-under-Lyme, England, United Kingdom
Rubber and Allied Products
Rubber and Allied Products is a permitted power plant in Newcastle-under-Lyme, England, United Kingdom, with 40 MW of capacity, operated by Volta Energy Storage.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Newcastle-under-Lyme (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Rubber & Allied Products Ltd, Turner Crescent, Newcastle-Under-Lyme, Staffordshire, ST5 7LU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 15 Dec 2017 (permit 17/00847/FUL, Town and Country Planning Act, issued by Newcastle-under-Lyme) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 20 Oct 2017 (reference 17/00847/FUL, planning authority Newcastle-under-Lyme) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 15 Dec 2017 (granted, reference 17/00847/FUL, planning authority Newcastle-under-Lyme) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Volta Energy Storage | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 40 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.0344, -2.2468 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Newcastle-under-Lyme, reference 17/00847/FUL)
- Permit applied for (planning authority Newcastle-under-Lyme, reference 17/00847/FUL)
How it compares
Rubber and Allied Products is the 836th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 836th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 1,342nd of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,556th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 112 substations, 101 grid connections (60 operating, 552 MW), 14 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Internet Central data center, England | Data center | — | — | 3.7 km |
| Salinae Hydrogen Storage project | Gas storage facility | — | Planned | 18 km |
| Dane Moss Solar PV grid connection | Grid connection | 7.5 MW | Planned | 24 km |
| Danes Moss Landfill grid connection | Grid connection | 1.97 MW | Operating | 24 km |
| Danes Moss Landfill Site 2 grid connection | Grid connection | 2.1 MW | Operating | 24 km |
| Keuper Gas Storage Project | Gas storage facility | — | Permitted | 25 km |
| Chelford | Substation | — | — | 25 km |
| S.E. Macclesfield | Substation | — | — | 25 km |
| Keuper Underground Gas Storage Facility Material Change 1 | Gas storage facility | — | Planned | 26 km |
Operator and place
More from Volta Energy Storage
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.