Power plant · Huntingdonshire, England, United Kingdom
Ramsey 1
Ramsey 1 is a power plant in Huntingdonshire, England, United Kingdom, with 1.8 MW of capacity, operated by REG Windpower.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Huntingdonshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Rear of Packing Station St Mary's Road Ramsey Cambs | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2008 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 23 Apr 2004 (permit 0300478/FUL, Town and Country Planning Act, issued by Huntingdonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 11 Mar 2003 (reference 0300478/FUL, planning authority Huntingdonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 23 Apr 2004 (granted, reference 0300478/FUL, planning authority Huntingdonshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | REG Windpower | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 1.8 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 1 units (1.8 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.4474, -0.1030 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Ramsey 1 is the 2,958th-largest of 3,430 power plants in England and the 4,399th-largest of 5,050 in the United Kingdom by capacity; its 1.8 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,958th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 4,399th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 10,752nd of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 0300478/FUL
- Started operating
Nearby
Within 50 km of this power plant: 61 grid connections, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Data center, England (OSM way 87850427) | Data center | — | — | 16 km |
| Positive Park | Data center | — | — | 19 km |
| Crowland, French Farm Wind Farm grid connection | Grid connection | — | — | 23 km |
| Land at Seven Wells Farm grid connection | Grid connection | — | — | 27 km |
| Wood Lodge Farm, Wood Lodge Solar Project grid connection | Grid connection | — | — | 27 km |
| West Cambridge Data Centre | Data center | — | — | 29 km |
| Kings Lynn B Connection Project | Transmission line | — | Permitted | 44 km |
Operator and place
More from REG Windpower
- Greenburn Wind Park67.2 MW · permitted
- Knockkippen Wind, Solar & Battery Farm60 MW · permitted
- Allt an Tuir Renewable Energy Park59.4 MW · planned
- Clay Tye Road - Solar Farm49.9 MW · planned
- Strath Tirry Wind Farm22.8 MW · permitted
- Knockkippen Wind, Solar & Battery Farm20 MW · permitted
- Old River Don Wind Farm18 MW
- Allt an Tuir Renewable Energy Park18 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.