Power plant · England, United Kingdom

Race Bank (Phase 2) Offshore Wind Farm

Race Bank (Phase 2) Offshore Wind Farm is an offshore wind power plant in England, United Kingdom, with 284 MW of capacity, operated by Ørsted and Macquarie Group.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRace Bank , Greater WashDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2018DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOffshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date23 Jan 2009 (planning authority DECC (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorØrsted (Orsted (formerly Dong Energy)/ Macquarie Group)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMacquarie Group (Orsted (formerly Dong Energy)/ Macquarie Group)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity284 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units45 units (6.3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OffshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.1367, 0.5927DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit applied for (planning authority DECC (S36))

How it compares

Race Bank (Phase 2) is the 94th-largest of 4,035 power plants in England and the 132nd-largest of 5,834 in the United Kingdom by capacity; its 284 MW is 0.14% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England94th of 4,035134,434 MW0.21%
United Kingdom132nd of 5,834200,500 MW0.14%
All power plants in our data1,665th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 6 grid connections (4 operating, 49.5 MW), 4 transmission lines and 4 substations, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Ossian Transmission InfrastructureTransmission line—Cancelled24 km
Grimsby to WalpoleTransmission line—Planned33 km
South RestonSubstation——38 km
Wind 20 MW grid connection at Gayton le Marsh WindfarmGrid connection20 MWOperating39 km
Solar 5 MW grid connection at South RestonGrid connection5 MWOperating39 km
Keddington RoadSubstation——47 km
Solar and Wind 17 MW grid connection at Fen Farm WindfarmGrid connection17 MWOperating47 km
GrainthorpeSubstation——47 km
Kings Lynn B Connection ProjectTransmission line—Permitted48 km

Operators and place

More from Ørsted

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page